Project
Construction of facilities for specialized production of heat transfer equipment used in power engineering and petrochemical industry.
Centralization of production to new modern premises will help company APEX to strengthen its position as one of the world leaders in the development and production of heat exchangers.
UNIPORT provided all phases of project preparation and implementation. From securing the land plot, through design work and obtaining the necessary permits to the choosing of the contractor and management of the construction itself.
2years
Duration of the Project
30.000m2
Total area of the Complex
7.500m2
Production Area
7
Bridge cranes
in the building
The made-to-measure production building is adapted for the production of complicated oversized units. The handling of products is ensured by a system of bridge cranes of loading capacity up to 25 tons.
APEX chose the plot for its development within the industrial zone prepared by UNIPORT. The future development of the complex is carefully planned and the production building is ready for gradual expansion.
We also placed great emphasis on creating a pleasant environment for employees. A quality canteen and properly dimensioned offices and social facilities are a precondition for stabilization of the employees.