Project
Construction of modern facility for the production of air conditioning systems.
In cooperation with the development company Goodmann, we delivered the building in record time and in perfect quality. The building was one of the first industrial facilities in Czechia to receive environmental certification LEED® GOLD.
Our company provided advice on the acquisition of the plot, coordination of design activities, value engineering and construction management.
7months
Duration of the Construction
90.000m2
Land Plot
30.000m2
Production area
4.000m2
Administrative and social facilities
The building with a reinforced concrete frame and a facade of sandwich panels is dominated by a distinctive two-storey administrative part. We made the construction more efficient by using the construction system Goldbeck.
Australian real-estate developer Goodman, which was the client in this project, invited us to cooperate as specialists in the construction of sophisticated production buildings. At the beginning of the cooperation there was a tight schedule, a limited financial budget and many unknowns.
At that time, the Trane Technologies building was the largest production hall being prepared in Czechia. The production hall has a lot of special technologies and its construction required the perfect coordination of many experts.
The professional management of the entire process by UNIPORT finally ensured the delivery of the new building in the expected time, significant savings in investment costs and perfect quality of the works.