Project

Production Facility for LAC

LAC

Our Task

Construction of a new production facility, enabling the expansion of the volume and range of production.

Quality environment is a guarantee for continuous innovation and overall stability of the company in the future.

Scope of cooperation

Our company provided all phases of project preparation and implementation. From choosing and securing a suitable land plot, through design work and securing the necessary permits to the choosing the contractor and construction management completed by final occupancy permit.

2years

Duration of the Project

30.000m2

Land Plot

6.000m2

Production Area

2.300m2

R&D and administrative facility

LAC

The building is designed as a partially two-storey building with a reinforced concrete frame and a facade of sandwich panels with an aesthetic accent to the front office part of the building.

LAC

Analysis of customer needs

At the first meetings, we analysed the needs of the customer in detail. On the basis of it we selected a suitable location for placing the LAC facility. This was followed by creation of a concept of construction and the associated cost estimate and master schedule.

LAC

Careful selection of the contractor of the construction

The design process followed, when we coordinated the work of many design specialists and subsequently all the necessary permits were obtained for the construction. We organized a tender for a general contractor, which was selected after 4 rounds of thorough negotiations.

LAC
LAC

Controlled construction supervision

The construction of such a building is a relatively complex process and it requires constant supervision. Without a well-managed construction process, there would be a lapse in quality, an extension of the construction time or the need of additional works and thus an increase in costs.

LAC
LAC

Are you planning a similar project?
Contact us!