Project
Construction of a new production facility, enabling the expansion of the volume and range of production.
Quality environment is a guarantee for continuous innovation and overall stability of the company in the future.
Our company provided all phases of project preparation and implementation. From choosing and securing a suitable land plot, through design work and securing the necessary permits to the choosing the contractor and construction management completed by final occupancy permit.
2years
Duration of the Project
30.000m2
Land Plot
6.000m2
Production Area
2.300m2
R&D and administrative facility
The building is designed as a partially two-storey building with a reinforced concrete frame and a facade of sandwich panels with an aesthetic accent to the front office part of the building.
At the first meetings, we analysed the needs of the customer in detail. On the basis of it we selected a suitable location for placing the LAC facility. This was followed by creation of a concept of construction and the associated cost estimate and master schedule.
The design process followed, when we coordinated the work of many design specialists and subsequently all the necessary permits were obtained for the construction. We organized a tender for a general contractor, which was selected after 4 rounds of thorough negotiations.
The construction of such a building is a relatively complex process and it requires constant supervision. Without a well-managed construction process, there would be a lapse in quality, an extension of the construction time or the need of additional works and thus an increase in costs.